Search This Blog

Friday, November 19, 2010

Week 12

We were a bit skeptical around this week whether we could complete the project ( Volunteer Management).
We had a lot of things to do and the coding section was going a bit slow.
There were a lot of ups and downs in the project. So , we decided to go faster than normal.
Dharmil was doing the validation, Dan was busy with fixing the site master( which is one of the important pages for us to proceed). I was worrying about the Ui stuff(as usual) and now I had to write a three repeater class for one of the pages. So, the whole lab went by reading code online and also refering the uprc code a little bit.
I had to do the volunteer and also the admin verification.
For eg:
How will you know if Admin has logged in or if a Volunteer has logged in.
So I had to work on what to hide of the Admin and what should be shown for the Volunteer.
I had to google a lot of stuff. I had to do a lot of research in this case.

In addition to that I have changed the default default and added image. It was a lot of work because of the repeater class which is fairly new to get used to. I also worked on changing the links and also the alignment of the links.

Thursday, November 11, 2010

Week 10,11 - Lab and team Meeting

Lab 10 and Lab 11 were full of coding , coding and coding. We did some extensive coding in these two weeks.
I have changed the code for the UI of some of the pages in the site.

I have been doing UI for a lot of pages since 2 weeks (Week10 &11) , but nothing was actually fully complete. So, I had no reflections.I cant seem to upload the screenshots of the site but you can view them on the original site once cfrc has put them on their host. They were Admin/ Events / default.aspx and Admin/Account/edit.aspx  and some other pages as well.

The meeting was pretty good, we have accomplished certain major tasks for this  week.